Michigan's Senate GOP pushed for fast track of Enbridge's Line 5 tunnel construction at a press conference this week. Sen. John Damoose, R-Harbor Springs, took to the podium in an energetic plea to keep things moving.
He said the construction project will create jobs and bring necessary propane that helps heat homes during the winter, calling it viable solution for the state's energy needs.
"Make no mistake the attack on line 5 is exactly that -a push to get rid of the oil and gas industry," Damoose said. "The fact is we could be halfway done with this tunnel right now if everybody would stop dragging their feet and do their jobs."
Opponents of the Line 5 project say anything short of a shutdown is a grave threat to the environment, tourism, fishing, shipping, and the Great Lakes, the largest body of fresh water in the world.
The pipeline project has long been surrounded by controversy. During the press conference, Damoose expressed frustration with ongoing protests in the upstate region.
Sean McBrearty, campaign organizer for the advocacy group Oil and Water Don't Mix, suggested that elected officials should listen to the concerns of Michigan residents instead of refrain from aligning with fossil fuel lobbyists. A dozen tribal nations are urging President Joe Biden to revoke the presidential permit for Enbridge's Line 5.
Source: publicnewsservice.org
Photo Credit: gettyimages-ligora
Categories: Michigan, Government & Policy